This project consisted of 104 feet of boardwalk, 90 feet of split rail fence and 12 feet
of chained opening. He also repositioned the end of one of Andrew Apostolopoulos
boardwalk that had been shifted by Hurricane Floyd and pinned it down with two-foot #4
rebars. He also set one sign post and lowered the end of another boardwalk. John Mergott
and Troop 154 completed this work in November 2000.